The tide gate enclosure project executed by CJW Construction, Inc. was a design-build task order for the United States Navy, involving the rehabilitation of a pump station that controlled fresh water drainage outflow to the Pacific Ocean. During the upgrade, the Navy requested a new building to house the pumps that were installed. This building request was unique because the Navy asked that the roof have removable panels in the event they needed to repair or remove the pumps. The enclosure was easily installed in seven days, even while working over water.